Fee Schedule FY 2026-2027

Erosion and Sedimentation Control

FY 26-27 Fee

Plan Review

$200.00/plan

Plan Review - Revisions (increases the amount of land disturbance after initial plan has

been approved)

$200.00/Plan

Land Disturbance - (disturbance >1 acre)

NEW SUBDIVISIONS have a choice to include all land disturbance including lots into original erosion control plan or choose to permit each individual lot as it is developed with the fee schedule item below. *Contact our office for more information on this item before submitting for approval.

$300.00/acre or any portion of an

acre

NEW SUBDIVISION - Single Family Lot in a residential, or common plan of development that is less than one acre.

$100.00/lot

Brush Removal Permit (Unincorporated areas only)

$100.00/acre or any portion of an

acre

Beginning work without permit (Double permit fee)

(varies)

Transfer of Permits

$200.00

Trip Charge (when a complaint warrants repairs or permits)

$50.00 per trip

Appeal

Advertising Fees Only

 

Stormwater Phase II Post Construction Runoff

 

New Stormwater Phase II Post Construction Runoff permit or major modification – 0 or 1 Stormwater Control Measures (SCMs)

$1,000.00

New Stormwater Phase II Post Construction Runoff permit or major modification – 2 SCMs

$1,250.00

New Stormwater Phase II Post Construction Runoff permit or major modification – 3 SCMs $1,750.00
New Stormwater Phase II Post Construction Runoff permit or major modification – 4 or more SCMs

$2,250.00

Stormwater Phase II Post-Construction Runoff (Renewals) High Density Only (Every 8

years)

$750.00

Stormwater Phase II Post-Construction Runoff (Revisions) when project increases the

impervious surface from original submittal (minor modification)

$250.00

Transfer of Permits

$750.00

Trip charge (when a complaint warrants repairs or permits)

$50.00 per trip

Appeals

Advertising fees only

 

Watershed Fees

 

Watershed Use Permit (New) (High Density) if grading exceeds (1) one acre

$505.00

Watershed Use Permit (New) (Low Density) if grading exceeds (1) one acre

$250.00

Redevelopment (High Density) when project adds additional impervious surface (5000 SF

or more)

$505.00

Redevelopment (Low Density) when project adds additional impervious surface (5000 SF

or more)

$250.00

Trip charge (when a complaint warrants repairs or permits)

$50.00 per trip

Appeal

Advertising fees only

 

Flood Damage Prevention Ordinance

 

Flood Development Permit for property in the Floodway

$500.00 plus expenses

Flood Development Permit for property in the Floodway (Revisions)

$250.00 plus expenses

Flood Development Permit for property located only in the 1% (100 year) special flood

hazard area.

$100.00

Flood Development Permit for property located only in the 1% (100 year) special flood

hazard area. (Revision)

$50.00

Flood Development Fill Permit (up to 20% of SFHA)

$100.00 (does not include floodplain

development permit)

Special Fill Permit (over 20% fill with required "No Impact" Certification. (Public Hearing

Required)

$500.00 plus expenses (does not include floodplain development permit)

Variance (Public Hearing Required)

$200.00

Trip charge (when a complaint warrants repairs or permits)

$50.00 per trip

Appeal

Advertising fees only

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download