Site Development

Synonym: 
waterresources

Inter Active Map (Post-Construction Stormwater Permitting Map)

Post-Construction Stormwater Permitting Map (Inter-Active), just enter your address with the search tool.  Once you locate your address, click on the map area around the subject address and the permit authority information will display.

Annual Inspection Requirements

Chapter 42, Section 241.2.B Annual Inspection and Report. The person responsible for maintenance of any structural stormwater BMP installed pursuant to Subpart B shall submit to the Water Quality Administrator an inspection Report from either a qualified registered North Carolina Professional Engineer or Landscape Architect.

The inspection report shall contain all of the following:

Close Out Requirements (Fast-Track)

Below you will find a document entitled "Close Out Requirements" for Fast-Tracked Stormwater Phase II Post-Construction projects (High Density).  You will find additional documentation below explaining each item required for a Certificate of Occupancy to be issued on the completed project.

Airport within 5 miles of project?

S.L. 2012-200

PART VI. DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO ACCEPT ALTERNATIVE MEASURES OF STORMWATER CONTROL AT PUBLIC AIRPORTS

SECTION 6.  G.S. 143‑214.7 is amended by adding two new subsections to read:

Fee Schedule FY 2020-2021 (Fast-Track)

Stormwater Phase II Post-Construction

Fast Track Permit Process Fee Schedule

July 1, 2020

Fast-Track Permit Program (Project must qualify for this program)

Fast Track Authorization to Construct (ATC) (good for 5 years)

$505.00

Stormwater LID and Storm EZ

Low Impact Development (LID) is a voluntary approach to stormwater management that can benefit both the economy and the environment by reducing infrastructure costs, increasing lot yields and enhancing water quality protection.

The Definition of LID

A development is considered LID when the volume of runoff leaving the site after development matches the volume of runoff before development. In addition, the  LID project should maintain adequate flows to the streams and wetlands on the site rather than piping stormwater to a single low point.

What is Storm EZ?

Minimum Design Criteria (MDC) for Stormwater Systems

Below you will find the rules on minimum design criteria (MDC) for stormwater treatment devices listed in the North Carolina Stormwater BMP Manual.