Minimum Design Criteria (MDC) for Stormwater Systems

Below you will find the rules on minimum design criteria (MDC) for stormwater treatment devices listed in the North Carolina Stormwater BMP Manual.

Minimum Design Criteria (MDC) for Stormwater Systems

Below you will find the rules on minimum design criteria (MDC) for stormwater treatment devices listed in the North Carolina Stormwater BMP Manual.

Approved fees for FY 2020-2021

Stormwater Phase II Post-Construction

Fast Track Permit Process Fee Schedule

July 1, 2020

Fast-Track Permit Program (Project must qualify for this program)

Fast Track Authorization to Construct (ATC) (good for 5 years)

$505.00

Stormwater Ordinance (Town of Laurel Park)

The ordinance can be viewed online by clicking the link below:

Chapter 53 - Town of Laurel Park Ordinances - Stormwater Management

Inter Active Map (Post-Construction Stormwater Permitting Map)

Post-Construction Stormwater Permitting Map (Inter-Active), just enter your address with the search tool.  Once you locate your address, click on the map area around the subject address and the permit authority information will display.

Annual Inspection Requirements

Chapter 42, Section 241.2.B Annual Inspection and Report. The person responsible for maintenance of any structural stormwater BMP installed pursuant to Subpart B shall submit to the Water Quality Administrator an inspection Report from either a qualified registered North Carolina Professional Engineer or Landscape Architect.

The inspection report shall contain all of the following:

Close Out Requirements (Fast-Track)

Below you will find a document entitled "Close Out Requirements" for Fast-Tracked Stormwater Phase II Post-Construction projects (High Density).  You will find additional documentation below explaining each item required for a Certificate of Occupancy to be issued on the completed project.