ORDINANCE REQUIREMENTS:

§ 53.04 APPLICABILITY AND JURISDICTION.

Stormwater Management Standard Forms (Low Density)

Stormwater Phase II Post - Construction (LOW DENSITY)

Objectives:
  • Limit amount of built-upon surfaces per the most current state rules and local ordinances.
  • No collection system - (limited piping-only enough to get under a road, no inverted crown streets)
  • Sheet flow stormwater

Stormwater Standard Forms (High Density)

(High-Density) 24% or greater in impervious surface
Required Forms:
Henderson County Stormwater Permit Application
Access Easement - BMP
Stormwater Agreement
 

How to address water drainage from adjoining parcels?

INFORMATION

Any improvement to land made by private citizens will affect the otherwise natural flow of water. The disruption of the natural flow of water drainage can be a nuisance and/or cause damage to neighboring landowners. 

Harm caused by surface water drainage has been handled differently by various jurisdictions throughout the United States, but can be summarized by three (3) basic doctrines or rules:

The “Common Enemy Rule;”  
The “Civil Law Rule,” or Anti-Common Enemy Rule; and 
The “Reasonable Use Rule.”  

NPDES (NCG01) and Self Inspection Information

The NPDES construction stormwater permit process changed on April 1, 2019.  See documents below for more information or go to NC DEQ Construction Stormwater Webpage by clicking on this link.

The two sheets below are required to be included as part of the SESC plan. The plan sheets are provided below in PDF format for your convenience. If would like a CAD versions of these sheets contact our office. 

NPDES and Self Inspection Information

The NPDES construction stormwater permit process has changed as of April 1, 2019.  See documents below for more information or go to NC DEQ Construction Stormwater Webpage by clicking on this link.

 

NPDES and Self Inspection Information

The NPDES construction stormwater permit process has changed as of April 1, 2019.  See documents below for more information or go to NC DEQ Construction Stormwater Webpage by clicking on this link.

 