93-61. Application.

  1. Any person(s) who wish (es) to connect to the water system and/or the water system owned by the city and maintained and operated by the Authority must make application to the Utilities Director on the approved form. Said application form shall be completely filled out, properly signed, and notarized.
  2. The applicant shall be required to comply with all application requirements and other requirements of the Authority Policies as contained in Paragraph III(B), III(C), III(D) and III(E), which requirements are hereby incorporated by reference as if fully set forth herein, except for the following:
    1. All required information shall be submitted to the Utilities Director, who shall review it for conformity with the provisions of this Part 2. Upon a determination that the application is in conformance with the provisions of this Part 2, the Utilities Director shall approve the application on behalf of Henderson County, and forward the application to the Authority Director.
    2. The connections must comply with any and all rules, regulations, or requirements of the North Carolina Department of Environment and Natural Resources if applicable, not the Department of Human Resources.
    3. If the connection is made to a regional water line, all net revenues generated by the connection shall be deemed net revenues to be credited towards the actual regional water line costs of the regional water line to which it is connected in calculating additional payments required of the applicant or the County, if any, in accordance with ยง93-68A (1) and 93-69 below.
    4. Any references to "the city" shall be deemed to refer to "the city and/or the County (Henderson County) as appropriate."
    5. The Utilities Director, the Henderson County Engineer, and/or any duly authorized employee or agent of the Authority and/or the city shall have the authority to inspect any connection. Such inspection shall not consist of or imply supervision or approval of the work or materials in the extension project. Neither the County, the Utilities Department, the City, nor the Authority assumes any responsibility for the work performed or materials supplied.
    6. If the connection is a regional water line or is connected to a regional water line, the Utilities Director shall have the right granted by Subsection 6.4 of the Regional Water Agreement to report in writing to the Authority Director any deviations of the connection, said Subsection 6.4 being incorporated by reference as if fully set forth herein.
    7. The Applicant shall be subject to the fee schedule adopted by the County and/or the districts.
    8. The Utilities Director shall determine the location of the connection to be made. The Utilities Director shall review the application to determine whether the connection can be made into a regional water line, or any water line owned by the County. If the Utilities Director determines that connection can be made into a regional water line, or a water line owned by the County, the applicant shall be required to connect into said regional water line or line owned by the County. In the event the Utilities Director determines that a connection can be made into proposed regional water line, or a line proposed for construction by the County, but such lines have not been constructed or are in the process of being constructed, the Applicant may be granted a conditional permit by the Utilities Director, allowing connection into any available line of the water system owned by the city and maintained and operated by the Authority until such time as the construction of the regional water line or other County-owned line has been completed, at which time the applicant shall be required to connect into such regional water line or County-owned line.
  3. Any person who connects to the water system and/or the water system owned by the City and maintained and operated by the Authority will be required to sign a water service agreement in accordance with the terms and conditions contained in Article 6 below.