49-14. Demolition

In considering a request for a certificate of appropriateness to demolish a structure within a historic landmark, the ZBA shall weigh the impact of the proposed demolition on the character of the historic landmark, as well as surrounding buildings.

  1. All alternatives to demolition shall be evaluated.
  2. Significant structure features shall be documented, including photographs and measured drawings completed to the standards established within the Historic American Buildings Survey.
  3. Prior to demolition, the property owner shall work to salvage usable architectural materials and features.
  4. There may be a delay in demolition of historic landmarks and buildings. The period of delay shall be reduced by the ZBA if it finds that the owner would suffer extreme hardship or be permanently deprived of all beneficial use or return from such property. The waiting period for demolition must be established in the original designation order and cannot exceed 365 days.