42-87. Advisory Provisions

  1. Soils Map. Applicants for subdivisions with lots smaller than one (1) acre in size should consult a soils map of the property and be knowledgeable of the suitability of ground absorption systems on the property.
  2. Utility Easements. Utility easements should be:
    1. Centered on rear or side lot lines,
    2. At least 20 feet in total width, and
    3. Identified following discussion with the appropriate utility agency.
  3. Stream Setbacks. See §42-250 (Perennial and Intermittent Surface Water Buffers).
  4. Traffic Impact Study (TIS) and Emergency Services Impact Report (ESIR). See Article IV (Adequate Public Facilities Regulations) for traffic impact study and emergency services impact report requirements.