Site Development

Synonym: 
waterresources

Close Out Requirements (Fast-Track)

Below you will find a document entitled "Close Out Requirements" for Fast-Tracked Stormwater Phase II Post-Construction projects (High Density).  You will find additional documentation below explaining each item required for a Certificate of Occupancy to be issued on the completed project.

Stormwater LID and Storm EZ

Low Impact Development (LID) is a voluntary approach to stormwater management that can benefit both the economy and the environment by reducing infrastructure costs, increasing lot yields and enhancing water quality protection.

The Definition of LID

A development is considered LID when the volume of runoff leaving the site after development matches the volume of runoff before development. In addition, the  LID project should maintain adequate flows to the streams and wetlands on the site rather than piping stormwater to a single low point.

What is Storm EZ?

Minimum Design Criteria (MDC) for Stormwater Systems

Below you will find the rules on minimum design criteria (MDC) for stormwater treatment devices listed in the North Carolina Stormwater BMP Manual.

Submittal Requirements (Fast Track)

Not all projects will be eligible for permitting under the Fast Track Process. Review the eligibility requirements below before proceeding.  If your project does qualify, below are the submittal requirements.

Water Supply Watershed (WSWS) Management

UNDER CONSTRUCTION - CHECK BACK PERIODICALLY

 

Stormwater LID and Storm EZ

Low Impact Development (LID) is a voluntary approach to stormwater management that can benefit both the economy and the environment by reducing infrastructure costs, increasing lot yields and enhancing water quality protection.

The Definition of LID

A development is considered LID when the volume of runoff leaving the site after development matches the volume of runoff before development. In addition, the  LID project should maintain adequate flows to the streams and wetlands on the site rather than piping stormwater to a single low point.

What is Storm EZ?

Airport within 5 miles of project?

S.L. 2012-200

PART VI. DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO ACCEPT ALTERNATIVE MEASURES OF STORMWATER CONTROL AT PUBLIC AIRPORTS

SECTION 6.  G.S. 143‑214.7 is amended by adding two new subsections to read:

Minimum Design Criteria (MDC) for Stormwater Systems

Below you will find the rules on minimum design criteria (MDC) for stormwater treatment devices listed in the North Carolina Stormwater BMP Manual.